Skip to main content

ARTBA addresses wetlands permissions

The American Road & Transportation Builders Association (ARTBA) is offering the US Army Corps of Engineers (Corps) advice on reducing unnecessary regulatory red-tape on transportation projects through improving the wetlands permissions process. ARTBA has submitted comments to the Corps in response to a government-wide regulatory review initiated by President Obama in 2011. This advice from ARTBA details specific recommendations to make wetlands permitting more efficient. ARTBA is working on ways to reduce u
April 19, 2012 Read time: 2 mins
The American Road & Transportation Builders Association (ARTBA) is offering the US Army Corps of Engineers (Corps) advice on reducing unnecessary regulatory red-tape on transportation projects through improving the wetlands permissions process. ARTBA has submitted comments to the Corps in response to a government-wide regulatory review initiated by President Obama in 2011. This advice from ARTBA details specific recommendations to make wetlands permitting more efficient. ARTBA is working on ways to reduce unnecessary delays in the transportation review and approval process. Currently, it can take anywhere from nine to 19 years for a project to go from planning to completion. ARTBA stressed the need to make the wetlands permitting process less complicated, without sacrificing environmental protections. It has asked the Corps to place strict time limits on permitting decisions, allowing planners to know exactly when a decision would be reached on a project and plan accordingly. ARTBA has suggested that no permits should be required when projects do not have an ecological effect on wetlands, and regulations should not be mandated when there is no practical need. In addition ARTBA also suggests that the US 1293 Environmental Protection Agency (EPA) should be removed from permission decisions. Protection of sensitive areas is assured though through ARTBA’s plan as both US Congress and the courts have given the Corps the sole responsibility for wetlands permissions. This policy would reduce bureaucracy as there is no need for two agencies to carry out a job that can be handled by one. ARTBA’s recent comments represent the fourth agency-wide regulatory review the association has participated in since early 2011. The association also offered detailed comments to the 2364 US Department of Transportation, EPA, and Small Business Administration

For more information on companies in this article

Related Content

  • India's road safety management innovations
    February 27, 2012
    Rohit Baluja is a man with a mission, and that is to help reduce the grim accident toll on India's roads, the worst in the world. Baluja, a shoemaker by trade, has been studying for a PhD in civil engineering, and this has involved regular trips to Birmingham, UK, to complete his doctorate. All this seems far removed from 18 years ago when in December 1991, using much of his own money, he founded the Institute of Road Traffic Education (IRTE), the only organisation in India that conducts accident investiga
  • Regional seminar on performance based contract for road, Arusha, Tanzania July 2016
    May 19, 2016
    Without timely and proper maintenance, the condition and value of road networks, and the benefits from investing in these road networks, deteriorate, diminish, and become smaller. In much of Africa, the condition of the road networks leaves much to be desired. The IRF Geneva is coming together with the Tanzanian Ministry of Works, Transport and Communications, the Tanzania National Roads Agency (TANROADS), the Tanzanian Roads Fund Board, Tanzanian Road Association (TARA), the Tanzania Transportation Tec
  • Headline Investing in corridors for shared prosperity
    February 27, 2015
    A major IRF regional congress is being held in Europe & Central Asia. The IRF’s global volunteer leadership invites those interested to take part in the 1st IRF Regional Congress in Europe & Central Asia held in Istanbul, on September 15-18, 2015. The European & Central Asia region is a geographic area covering 23 countries with a shared history of relatively recent transition from planned to market economies, and the profound impact this has had on trading patterns, transport services and infrastructure ne
  • Proper GPR Surveying Techniques
    May 10, 2019
    A sustainably good road surface often depends on how well understood is the ground underneath the road’s route. Brian Jones* offers some best practice and advice for getting the most from ground-penetrating radar investigations Ground-penetrating radar (GPR) is one of the most accurate non-destructive testing (NDT) methods available. To get the most from GPR surveying, it is absolutely essential to understand how GPR tools work and follow best practices when conducting surveys. Key areas to be aware o