Skip to main content

Arcadis for Calcasieu Bridge replacement work

Replacement of the 70-year-old Calcasieu River Bridge in the US state of Louisiana will revive a connection between the cities of Lake Charles and Westlake.
By David Arminas June 12, 2025 Read time: 2 mins
The 2km-long Calcasieu River Bridge, opened in 1952, is an arched cantilever, rivet-connected Warren through truss for the main span located on Interstate 10 between Lake Charles and Westlake (image © Typhoonski/Dreamstime)

Arcadis has been appointed to support the design work for the I-10 Calcasieu Bridge Improvements Project in the US state of Louisiana.

The replacement of the 70-year-old Calcasieu River Bridge will revive a vital connection between the Louisiana cities of Lake Charles and Westlake. With a project cost valued at US$2.3 billion, the Calcasieu Design Partners will upgrade a crucial 9km stretch of I-10, delivering enhancements to improve safety, connectivity and sustainability.

The 2km-long Calcasieu River Bridge, opened in 1952, is an arched cantilever, rivet-connected Warren through truss for the main span located on Interstate 10 between Lake Charles and Westlake. “The Calcasieu River Bridge has served the region for 70 years, but as it nears the end of its lifespan, the need for intelligent, modern and sustainable solutions is more critical than ever,” said Alan Brookes, chief executive of Arcadis.

Arcadis is working as part of a joint venture with Janssen and Spaans Engineering, Modjeski and Masters as well as Huval and Associates – collectively known as the Calcasieu Design Partner. The team will support Louisiana Bridge Builders, a construction joint venture between Arcadis’ key client Acciona and Sacyr Construction.

The project is overseen by the concessionaire, Calcasieu Bridge Partners (Acciona, Sacyr and Plenary), in collaboration with the Louisiana Department of Transportation and Development, also a key client of Arcadis.

Over eight years, Arcadis’ will update existing interchanges and roadways. Pulling on expertise from across North America, the Netherlands and the company’s Global Excellence Centers in India, Romania and the Philippines, Arcadis will deliver a range of specialised intelligent mobility, engineering and design services.

These include traffic engineering, including the development of a transportation management plan and the design of permanent signage, signals and pavement markings. There will be structural design work for sign support structures, roadway and drainage as well as bridge design for the I-10/I-210 flyover ramp and hydraulic modeling for the main span bridge.

Related Content

  • Bolivia’s new highway
    October 10, 2017
    Bolivia’s new highway will provide better access into mountain areas – Mauro Nogarin writes At the beginning of 2015, work began on the construction and paving for the Tupiza - Atocha - Uyuni highway project. The route is located in Bolivia’s Potosí department: it is 189m in length and forms part of the Southwest Basic Road Network (RVF) of Bolivia. The completion of this important route is requiring funding worth US$150 million, of which 72% is being delivered through loans from the European Investment
  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul
  • Chile's challenging bridge and tunnel construction
    February 27, 2012
    SACYR Chile is constructing a bridge on the new Northeast Access Highway in the capital Santiago, and when complete the 22.5km route will link the suburbs of Vitacura and Colina to the city. Acceso Nororiente, opening this year, is the fifth urban freeway in Santiago and stands out because of the challenges in the construction of its bridges ands tunnels.
  • VIDEO: Saskatoon bridge demolition removes final span
    November 18, 2016
    The final section of a defunct bridge in Saskatoon has now been removed by demolition contractor Rakowski Cartage & Wrecking. Excavators fitted with hydraulic breakers were employed by the firm to break up the final span, which collapsed into the river as planned. Demolition work to remove the defunct structure commenced in 2012. Other sections of the bridge were removed using explosive demolition earlier this year.