Skip to main content

Another US$94.08mn for repairs to Hammersmith flyover in London

A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
June 14, 2013 Read time: 2 mins
A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England.

2387 Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.

The latest work will take the total spent on maintaining it to at least $109.75 million (£70mn). The latest work will be carried out by the construction and civil engineering firm 2319 Costain.

Hammersmith flyover, which carries the A4 over Hammersmith and is used by 90,000 vehicles daily, will be subject to overnight lane closures, but engineers are confident there will be no need for weight restrictions.

Only last month, Hammersmith & Fulham Council (HFC) backed an expensive ‘flyunder’ tunnel as an alternative route into London from the west, but works could cost at least $392 million (£250mn) to complete.

Speaking recently on the long-running Hammersmith flyover safety saga, HFC council leader Nick Botterill reportedly said, “We know that vital repairs are necessary to the flyover but this needs to be the last time TfL spends a huge amount of taxpayers’ money on maintaining this monstrosity. Any other cash set aside for future work to the flyover needs instead to be pumped into making the flyunder a reality.

“A new tunnel solution would dramatically improve the quality of life for thousands of west Londoners and link the riverfront with Hammersmith town centre for the first time since the 60s.”

For more information on companies in this article

Related Content

  • New York tunnels upgrade complete
    June 9, 2022
    Upgrade work is complete for New York’s key tunnel links.
  • Highways Agency rebrands as part of its first five-year plan
    December 10, 2014
    The UK’s Highways Agency will rebrand as part of the organisation’s first five-year Strategic Business Plan to maintain England’s motorways and major A roads up to 2020. The plan for England’s strategic road network was developed response to the Road Investment Strategy published in early December. The UK government is getting set to make deliver the largest investment in roads since the 1970s and wants to make sure it gets value for money as well as nearly US$1.9 billion (£1.2 billion) of efficiency savin
  • BC ramps up Highway 1, Trans-Canada, repairs
    October 19, 2022
    The Canadian province has been working hard to repair major washouts along Highway 1 – the Trans-Canada Highway – since severe flooding last November.
  • Around US$1.87bn for Sydney roads and other infrastructure over 10 years
    May 20, 2013
    Roads in Sydney are set to benefit as part of a huge US$1.87 billion (AUD 1.9bn) capital works spending programme for the city over the next ten years. The programme, aimed at enhancing the international reputation of the city, includes $175.01 million (AUD180mn) for new roads and footpaths in Sydney. In order to transform George Street, $213.91 million (AUD 220mn) will be spent on connecting light rail and laneways, while $388.92 million (AUD 400mn) will go on upgrading Green Square, and a further $97.23 m