Skip to main content

Another US$94.08mn for repairs to Hammersmith flyover in London

A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
June 14, 2013 Read time: 2 mins
A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England.

2387 Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.

The latest work will take the total spent on maintaining it to at least $109.75 million (£70mn). The latest work will be carried out by the construction and civil engineering firm 2319 Costain.

Hammersmith flyover, which carries the A4 over Hammersmith and is used by 90,000 vehicles daily, will be subject to overnight lane closures, but engineers are confident there will be no need for weight restrictions.

Only last month, Hammersmith & Fulham Council (HFC) backed an expensive ‘flyunder’ tunnel as an alternative route into London from the west, but works could cost at least $392 million (£250mn) to complete.

Speaking recently on the long-running Hammersmith flyover safety saga, HFC council leader Nick Botterill reportedly said, “We know that vital repairs are necessary to the flyover but this needs to be the last time TfL spends a huge amount of taxpayers’ money on maintaining this monstrosity. Any other cash set aside for future work to the flyover needs instead to be pumped into making the flyunder a reality.

“A new tunnel solution would dramatically improve the quality of life for thousands of west Londoners and link the riverfront with Hammersmith town centre for the first time since the 60s.”

For more information on companies in this article

Related Content

  • Lower cost production
    April 16, 2012
    In Australia local authorities are facing increasing pressure to keep roads properly maintained while cutting costs at the same time. This presents a major problem, however two local authorities have begun using a novel solution to road maintenance and repairs, based around using the latest version of Caterpillar's RM300 rotary mixer.
  • Heated road repairs
    August 2, 2012
    New infrared asphalt restoration technologies, such as the Patriot system, are more reliable than before and offer cost benefits over time-consuming, cut-and-fill asphalt repairs. This technology offers benefits over conventional repairs which leave seams that can allow water penetration. Where thes eams are not watertight, the repaired, filled-in portion can fail within a year or so, however infrared technology blends the new asphalt with the old by heating an area 152-203mm beyond the perimeter of the rep
  • European project to deliver green traffic management
    March 20, 2012
    A major European project aimed at delivering green traffic management systems in European cities and towns will be officially launched at the National Space Centre in Leicester, England, tomorrow. The project, which brings together research clusters from five European regions, is being led by the University of Leicester and Leicester City Council. Other local partners are De Montfort University, The University of Nottingham and Astrium Services – Leicester who will be working in partnership with research cl
  • Key Nigeria port road resurfacing work
    October 5, 2018
    Resurfacing of an important port road connection in Nigeria is now complete. The Apapa Wharf road provides a vital link to the busy port of Apapa, close to Nigeria’s commercial centre of Lagos in the south west of the country. The road has been in desperate need of repair as it had been badly worn due to heavy traffic volumes. The new road section has now been constructed from concrete in a bid to offer a long working life and to allow the route to cope better with the high percentage of heavily laden truck