Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • Higher power cutter crushers from Labounty
    April 19, 2012
    Attachments specialist Labounty has introduced two new cutter crushers, said to be the most powerful in their class. The MDP 20R can be mounted to the dipper of a 25tonne machine or to the boom of an 18tonne carrier. The heavier MDP 30R matches the dipper of a 35 tonne excavator or the boom of a 25tonne.
  • Innovative concrete pumps developed by CIFA
    January 6, 2017
    CIFA is widening its range of innovative Carbotech concrete pumps with three new additions to the line-up. The firm introduced the first two truck-mounted models with carbon-fibre booms three years ago and the first two models in the range were the 45m class K45H and 62m class K62H. The new 29m class MK25H, 39m class K39H and 80m class K80H significantly broaden the Carbotech range. The most notable of these is the highly advanced K80H, which is now the concrete pump with the longest boom available for the
  • Innovative concrete pumps developed by CIFA
    February 7, 2013
    CIFA is widening its range of innovative Carbotech concrete pumps with three new additions to the line-up. The firm introduced the first two truck-mounted models with carbon-fibre booms three years ago and the first two models in the range were the 45m class K45H and 62m class K62H. The new 29m class MK25H, 39m class K39H and 80m class K80H significantly broaden the Carbotech range. The most notable of these is the highly advanced K80H, which is now the concrete pump with the longest boom available for the
  • Ammann’s EasyBatch 140 and Prime 140 plants’ touch screen movies at Conexpo 2014
    January 6, 2017
    The new EasyBatch 140 and Prime 140 trailer-mounted asphalt plants from Ammann can be seen via touch screen movies and advanced animations during ConExpo 2014.