Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • Hitachi wants to be the number one European equipment supplier
    January 6, 2017
    Hitachi Construction Machinery Europe boss Moriaki Kadoya told INTERMAT 2015 that the manufacturer wants to be number one in Europe as it launched a new hybrid ZW220 wheeled loader and a stage IV compliant Zaxis 300LC excavator.
  • Hitachi wants to be the number one European equipment supplier
    April 22, 2015
    Hitachi Construction Machinery Europe boss Moriaki Kadoya told INTERMAT 2015 that the manufacturer wants to be number one in Europe as it launched a new hybrid ZW220 wheeled loader and a stage IV compliant Zaxis 300LC excavator.
  • Hitachi aims for 20-30% growth in five years through mining offer
    January 6, 2017
    Hitachi Construction Machinery (Europe) president and chief executive Moriaki Kadoya believes HCME can achieve 20-30% sales revenue growth in the next five years through its wide range of mining-suited machines. The Hitachi Group subsidiary has a vast range of larger machines, including six crawler excavators – the 1200, 1900, 2600, 3600, 5600, and 800tonne 8000 model – which, Kadoya said, leaves HCME in an ideal position to pursue its ambitious growth target. The construction equipment industry giant also
  • Hitachi aims for 20-30% growth in five years through mining offer
    April 18, 2013
    Hitachi Construction Machinery (Europe) president and chief executive Moriaki Kadoya believes HCME can achieve 20-30% sales revenue growth in the next five years through its wide range of mining-suited machines. The Hitachi Group subsidiary has a vast range of larger machines, including six crawler excavators – the 1200, 1900, 2600, 3600, 5600, and 800tonne 8000 model – which, Kadoya said, leaves HCME in an ideal position to pursue its ambitious growth target. The construction equipment industry giant also