Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • Terex Finlay puts new I-100RS mobile impact crusher on bauma stage
    March 19, 2013
    The new Terex Finlay I-100RS mobile impact crusher and the Terex Finlay J-1170 jaw crusher will be showcased at bauma as part of the Terex Materials Processing exhibit. Claimed by Terex Finlay to be a compact and aggressive tracked primary jaw crusher, the J-1170 is said to have a robust hydrostatically driven Terex jaw chamber which provides high capacity with large reduction ratios. The jaw chamber configuration can be set up specifically for either processing construction demolition debris or quarrying a
  • Hyundai’s hydraulic hybrid offers 20% fuel savings
    January 6, 2017
    Hyundai Heavy Industries is showcasing a hydraulic hybrid machine at bauma. The R220-LC Hi-POSS is a 22tonne-crawler excavator with a system that allows brake energy to be used for other functions. Hi-POSS stands for Hyundai intelligent power optimal sharing and energy saving. “This is the most novel thing we have,” said Hyundai product engineer Joachim Van de Perre. “With a conventional excavator, when you brake, the energy heats the hydraulic oil. Here we use the energy to perform another task with the ma
  • Hyundai’s hydraulic hybrid offers 20% fuel savings
    April 18, 2013
    Hyundai Heavy Industries is showcasing a hydraulic hybrid machine at bauma. The R220-LC Hi-POSS is a 22tonne-crawler excavator with a system that allows brake energy to be used for other functions. Hi-POSS stands for Hyundai intelligent power optimal sharing and energy saving. “This is the most novel thing we have,” said Hyundai product engineer Joachim Van de Perre. “With a conventional excavator, when you brake, the energy heats the hydraulic oil. Here we use the energy to perform another task with the ma
  • New conference plans for European road directors
    October 30, 2013
    Plans are in hand for the Conference of European Directors of Roads (CEDR). This event is now run every four years, with this next CEDR conference being the third to be held. The governing board for CEDR held a meeting in Helsinki and the Road Directors’ association reviewed the final report on the implementation of its previous strategic plan and the formalisation of its next. The CEDR strategic plan 3 (SP3) is to develop the priorities and targets for its next cycle. Each SP determines the structuring an