Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • Element Six gives further boost to road pick life
    April 15, 2013
    Element Six is showing its second generation D Power road picks, which have been designed to give an even longer working life than the previous model. A new tougher steel surround has been developed to match the life of the polycrystalline diamond (PCD) tip. D Power road picks are now expected to give 50 times the overall life of standard machine milling picks, beating the figure of 40 claimed for the previous model. Synthetic diamond company Element Six is a member of the De Beers Group. Element Six’s mate
  • IRF Announces winners of 2017 Global Road Achievement Awards
    November 2, 2017
    The International Road Federation (IRF) has announced the winners of the 2017 IRF Global Road Achievement Awards at the closing of the IRF Middle East and North Africa Regional Congress and Exhibition. This year, the IRF honours 11 projects from around the world, each leading in innovation across major road and highway disciplines. The selection was made by an international panel of senior road development specialists. "Much of the transport sector's accomplishments are unnoticed by the hundreds of m
  • Ma-estro targets fuel theft with its new control system
    April 19, 2013
    Ma-estro, which manufactures automation and control systems for quarrying and construction sites, has launched two new products – Fuel Q-Control and Maintenance Q-Control.
  • Tunisia: Kairouan-Sousse motorway tender due in September
    March 18, 2015
    The invitation to tender for the Kairouan-Sousse motorway will be issued in early September, according to Tunis Afrique Press. Mohamed Salah Arfaoui, the Tunisian Minister for Infrastructure, Housing and Territorial Development, made the announcement, saying that the project is expected to cost around US$70 million. Financing will be aided by the World Bank, he added. Meanwhile, construction started in November on the last part of the Trans-Sahara Highway connecting the Algerian capital Algiers to the Niger