Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • Haulotte sees sales growth in 2012
    January 6, 2017
    French access and telehandler manufacturer Haulotte returned to profit in 2012 and, though the first quarter of 2013 is down year-on-year, CEO Alexandre Saubot remains confident about continued growth this year. “We achieved a decent performance in 2012 with almost 16% growth,” said Saubot. “2013 will remain a challenge for us, we will have to continue to work hard for sales growth.”
  • Haulotte sees sales growth in 2012
    April 18, 2013
    French access and telehandler manufacturer Haulotte returned to profit in 2012 and, though the first quarter of 2013 is down year-on-year, CEO Alexandre Saubot remains confident about continued growth this year. “We achieved a decent performance in 2012 with almost 16% growth,” said Saubot. “2013 will remain a challenge for us, we will have to continue to work hard for sales growth.”
  • VIDEO captures unloved, unowned Reynolds Bridge reduced to rubble
    May 18, 2015
    There was a big bang in a small town in the US state of Pennsylvania this month when a fragmentation explosion brought down the 100-year-old Reynolds Road Bridge. It was the end to the unloved bridge near Factoryville, population around 1,500. Factoryville is notable for a lack of factories ever since the one and only plant, a wool-into-cloth factory, closed down several years after it opened in the 1800s. Local residents were not sorry to see the felling of the 40m long, reinforced concrete arch deck
  • INTERMAT launch for Topcon total stations
    January 6, 2017
    A new range of reflectorless total stations has been developed by Topcon. Called the ES series, the new models also feature TSshield – a Topcon Group innovation using a multi-function telematics-based communication module that locates the instrument.