Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • New visual identity for Atlas Copco’s Dynapac road construction equipment
    April 19, 2013
    Atlas Copco Road Construction Equipment has decided to align the visual identity of its Dynapac range of rollers and pavers to the design used by the other divisions in the Atlas Copco Construction Technique business area. Launched at bauma, the new Atlas Copco logotype is clearly visible on the products together with the Dynapac name. The colour scheme changes to yellow and grey, which is already used for construction tools, portable compressors and generators.
  • LuiGong celebrates joint venture partnerships
    April 15, 2013
    LiuGong and its partners – Cummins and ZF – chose bauma 2013 to celebrate a string of successes with joint ventures, shared factories, and profitable partnerships. “We looked for only the best partners that share our commitment to excellence,” said Zeng Guang’an, LiuGong’s vice chairman and president. “With Cummins and ZF we believe we have found two of the best.” LiuGong’s joint venture with ZF began in 1995, which allowed the Chinese maker to cost-effectively incorporate high-level ZF technology into its
  • LuiGong celebrates joint venture partnerships
    January 6, 2017
    LiuGong and its partners – Cummins and ZF – chose bauma 2013 to celebrate a string of successes with joint ventures, shared factories, and profitable partnerships. “We looked for only the best partners that share our commitment to excellence,” said Zeng Guang’an, LiuGong’s vice chairman and president. “With Cummins and ZF we believe we have found two of the best.” LiuGong’s joint venture with ZF began in 1995, which allowed the Chinese maker to cost-effectively incorporate high-level ZF technology into its
  • Virginia state issues RFP for $2.1 billion Interstate 66 toll expansion
    December 23, 2015
    The Virginia Department of Transportation (VDOT) has issued a draft request for proposals (RFP) for the US$2.1 billion Interstate 66 tolled expansion project. Work under a 40-50-year public-private partnership is expected to include construction of 46km of lanes.