Skip to main content

$117 million Rawalpindi ring road project

Work is 50% complete for Rawalpindi’s $117 million ring road in Pakistan
By MJ Woof May 12, 2025 Read time: 1 min
The RRR project in Pakistan should be complete in late 2025 and will help cut journey times in Rawalpindi – image courtesy of © Mortenhuebbe| Dreamstime.com


Construction of Rawalpindi’s ring road project in Pakistan is 50% complete. The 38km route is now costing $117 million to build. The committee of the National Economic Council (ECNEC) of Pakistan approved the revised budget for the project. 

The work includes building five interchanges, a bridge over a railway, two bridges spanning rivers and seven stormwater bridges as well as 11 overpasses, 10 underpasses and 53 culverts. The interchanges are located at Baanth, Chak Beli Khan, Adiala Road, Chakri Road, and Thalian.

The Rawalpindi Ring Road (RRR) project is being built by the Frontier Works Organization (FWO). The RRR is being managed and overseen by the Rawalpindi Development Authority (RDA) via its Project Management Unit (PMU), which was established specially for the project.

The RRR alignment runs between Baanth Mor, Rawat, on GT Road and the Thalian Interchange. Construction of the new RRR will cut chronic car congestion in the centre of the city. The construction operation is being speeded up, so as to meet the December 2025 completion schedule.

 

 

Related Content

  • The tender process for a key highway project in Nepal is opening
    October 15, 2019
    Tendering is opening for the consultation work for Nepal’s major Kathmandu-Terai/Madesh Expressway project. World Highways correspondent for Nepal, Ram Krishna Wagle, reports that the route will be designed to meet the Asian Highway Primary Class A standard. The work will review the previously completed detail engineering survey, detail design of expressway, the design of the expressway retaining structures, cross-drainage structures and drainage structures. It will also review river training structures, hi
  • Dubai road works complete
    June 2, 2022
    An improved road link is open in Dubai.
  • Linking Kenya and Uganda with a new road project
    May 10, 2018
    An upgraded road link will improve transport between Uganda and Kenya - Shem Oirere reports Rainfall patterns and type of soil in an agricultural rich area shared by the neighbouring East African countries of Kenya and Uganda was a key consideration in arriving at the decision to upgrade to bitumen standards 73km of the 118km Kapchorwa-Kitale road that links the two countries. Initially, Uganda had proposed to have the road between Kapchorwa and Suam on its border with Kenya re-gravelled and widened to a
  • Elevated road project in Lima Peru – completion in 2027
    October 24, 2023
    Completion of the elevated road project in Lima, Peru is due in 2027.