Skip to main content

IRF Washington advocates for PPPs in traffic enforcement to boost safety

New IRF Policy Paper outlines effective automated traffic enforcement PPP models. In most countries traffic enforcement cameras and other equipment are purchased, owned, and operated by government organisations. The past two decades have seen a wide-ranging wave of privatisations and introduction of public private partnerships (PPP) in formerly government-owned or controlled activities, including traffic enforcement. Implementing this concept requires a set of principles and good practices presented in
November 10, 2015 Read time: 2 mins
New IRF Policy Paper outlines effective automated traffic enforcement PPP models

In most countries traffic enforcement cameras and other equipment are purchased, owned, and operated by government organisations. The past two decades have seen a wide-ranging wave of privatisations and introduction of public private partnerships (PPP) in formerly government-owned or controlled activities, including traffic enforcement. Implementing this concept requires a set of principles and good practices presented in this IRF policy statement.

In a policy statement released by the IRF and available at 3918 IRF Washington website, good practice guidelines are shared for effective automated traffic enforcement PPP models around the world. These models require at a minimum a private party willing to supply the cameras at no upfront charge to the public party, which could be a municipality, county, state, or nation, and provide a service to issue tickets and collect fines. In these schemes, the private party agrees to recover its investment over time by receiving a negotiated percentage of the fines revenue with a “capped” or maximum monthly or annual payment to the private party established between the public and private party. This cap should not prevent the private party from issuing tickets after this cap is reached, which means a reasonable per ticket fee only to cover the private party’s additional costs should continue after reaching this cap.

Moreover, an independent third party must be hired to approve, routinely inspect, verify and calibrate each camera and the processes to confirm the intended performances.

Lastly, public acceptance of PPP schemes can be strengthened through campaigns pledging that, once the cost thresholds for all the private parties (camera supplier & operator, third party auditors, etc.) are met, revenues generated from the collection of fines are reinvested in road safety related projects.

For more information on companies in this article

Related Content

  • Road markings important for road safety
    February 20, 2012
    Manufacturers are constantly upgrading marking materials and equipment. Now those responsible for highways are being asked to do more as Patrick Smith reports. A recent report claimed that nearly one-third of the length of Britain's single carriageway A-roads have white lines so worn out that they do not meet recognised standards. According to the LifeLines Report, an assessment of more than 2,400km of the road network, Britain's most dangerous roads have the most worn-out centre line markings of all, leavi
  • IRF chairman and mayor of Riyadh discussed the forthcoming IRF conference with World Highway
    April 12, 2013
    Every four years, for the last 60 years, the International Road Federation (IRF) has brought transportation officials and experts from around the world together in one place for the IRF World Meeting & Exhibition. This is the premiere global event for transportation professionals. The 17th IRF World Meeting & Exhibition is set to happen in Riyadh, Saudi Arabia, November 9–13, 2013, and features a compelling executive and interactive session programme and a peer-reviewed technical and scientific session prog
  • Conference success in Lisbon
    February 14, 2012
    The International Road Federation's (IRF) conference in Portuguese capital Lisbon was a major success, attracting 1,500 industry professionals from all over the world
  • Montreal’s new Champlain Bridge is in a race against time
    June 8, 2018
    Montreal’s US$3.24 billion Champlain Bridge across the St Lawrence River may not be open on time, according to a report by the independent Auditor General. The 3.4km cable-stayed bridge has two decks supporting three lanes of highway traffic in each direction. A third, central deck supports a mass transit system and a multi-use path. The new bridge will replace the nearby 50-year-old Champlain Bridge which has been deteriorating at an alarming rate. The government signed a contract in 2015 with a private